|
Author, Hawa, DK9KX
Just imagine that we seven ops, (from l to r)
|
|
Due to the weight restriction on the flight Rarotonga > Manihiki Since our last expedition was in 2009 (3D20CR) After a short while I was in contact with Nancy Kora, Also in August 2011 I booked and paid all seven seats Beginning September 2011 I collected all the personal belongings The belongings and the station set-up (246kg) was packed into 5 big On November 3, 2011 Mr. Katoa Banaba issued the Now we had to wait for transport from Rarotonga to Manihiki After having the confirmation that all equipment was on Manihiki By the end of December we made our plan known to Most of us flew with Korean Air from Frankfurt to Seoul On March 27 at 19:00z we flew out from Rarotonga and
|
|
Parking lot at Manihiki Airfield.
|
|
Left: 40m vertical During two weeks we were able to work Only 4 qso’s on 6 meter but 26 qso’s on 60 meter. We want to say thank you to all Organisations and to all BTW:
SOURCE:http://manihiki2012.de/report.html |
No related posts.







